31
EXTRACT from a telegram from the Governor of Hong Kong to
the Secretary of State for the Colonies.
Dated 4th May, 1927.
X
X
X
As regards further dredging this can be, if necessary, left over for consideration during progress of work already authorised as the amount of material
available from authorised work is now estimated on
further survey (at) 1,470,000 cubic yards instead of
1,030,000 cubic yards and will nearly suffice for
that part of the aerodrome site which must be filled
in. Balance of the site includes basin for typhoon shelter (see enclosure in my separate despatch of 28th March) and until this is settled the amount of
material required cannot be ascertained. As regards details of further dredging see Admiralty Chart No.1466. Proposed channel approximately 6,500 feet long would be dredged in straight line in South Easterly direction.
commencing from point 2,500 feet south by west of the
most westerly hill (231 feet high) on Stonecutters Island
distant 5,000 feet from White Point, Stonecutters Island. to a point due south of and/South westerly direction in
my telegram of 5th March should read South easterly. Nature of the material to be dredged expected to be chiefly silt and
mud. Direction of proposed channel is in line with
general flow of the tide and it may be expected to maintain
itself.
No comments yet.
Private notes are available after approval.